GPAC Gas Plant Tour

GPAC Gas Plant Tour

GPAC Gas Plant Tour

by
123 123 people viewed this event.

We are excited to invite you to an exclusive opportunity to tour the Harmattan Gas Processing Complex, owned and operated by AltaGas.

The Harmattan complex has natural gas processing capacity of 490 Mmcf/d consisting of sour gas treating, co-stream processing, NGL extraction, and 35,000 Bbls/d of NGL fractionation and terminalling. Harmattan also has a 450 Bbls/d capacity frac oil processing facility, a 200 tonnes/d capacity industrial grade carbon dioxide (CO2) facility and a 10,000 Bbls/d capacity NGL truck offload facility. Harmattan extracts NGLs from the raw natural gas delivered for processing, fractionates the recovered NGLs into specification ethane, propane, butane and condensate, and provides storage and terminalling services for each product. (www.altagas.ca)

Event Details:
Thursday, October 2, 2025

  • 08:30 Meet at SAIT – outside Clayton Carroll Building, just west of the MacPhail School of Energy
  • 09:00 Bus departure
  • 10:30 Arrive at Harmattan Gas Plant
  • 10:30 – 11:00 Safety orientation
  • 11:00 – 13:00 Plant tour
  • 13:00 – 15:00 Lunch
  • 15:00 – 17:00 Return to SAIT

Cost (gst): $50/GPAC member & $75/non-member

Included:

  • Transportation to and from the SAIT campus
  • Lunch sponsored by Spartan Controls

Other Considerations:

No loose clothing; long pants; sturdy closed toed shoes required.

Don’t miss this chance to explore a key facility in Alberta’s energy sector, connect with industry professionals, and gain valuable insights into the gas processing industry.

Signup today as space is limited!

To register for this event please visit the following URL: https://securegs.com/gpac/order/7898 →

 

Date And Time

2025-10-02 @ 08:30 AM to
2025-10-02 @ 05:00 PM
 

Registration End Date

2025-10-01
 

Location

Share With Friends

GPAC Gas Plant Tour

GPAC Gas Plant Tour

by

123 123 people viewed this event.

We are excited to invite you to an exclusive opportunity to tour the Harmattan Gas Processing Complex, owned and operated by AltaGas.

The Harmattan complex has natural gas processing capacity of 490 Mmcf/d consisting of sour gas treating, co-stream processing, NGL extraction, and 35,000 Bbls/d of NGL fractionation and terminalling. Harmattan also has a 450 Bbls/d capacity frac oil processing facility, a 200 tonnes/d capacity industrial grade carbon dioxide (CO2) facility and a 10,000 Bbls/d capacity NGL truck offload facility. Harmattan extracts NGLs from the raw natural gas delivered for processing, fractionates the recovered NGLs into specification ethane, propane, butane and condensate, and provides storage and terminalling services for each product. (www.altagas.ca)

Event Details:
Thursday, October 2, 2025

  • 08:30 Meet at SAIT – outside Clayton Carroll Building, just west of the MacPhail School of Energy
  • 09:00 Bus departure
  • 10:30 Arrive at Harmattan Gas Plant
  • 10:30 – 11:00 Safety orientation
  • 11:00 – 13:00 Plant tour
  • 13:00 – 15:00 Lunch
  • 15:00 – 17:00 Return to SAIT

Cost (gst): $50/GPAC member & $75/non-member

Included:

  • Transportation to and from the SAIT campus
  • Lunch sponsored by Spartan Controls

Other Considerations:

No loose clothing; long pants; sturdy closed toed shoes required.

Don’t miss this chance to explore a key facility in Alberta’s energy sector, connect with industry professionals, and gain valuable insights into the gas processing industry.

Signup today as space is limited!


To register for this event please visit the following URL:

https://securegs.com/gpac/order/7898 →

 

Date And Time


2025-10-02 @ 08:30 AM

to
2025-10-02 @ 05:00 PM

 

Registration End Date

2025-10-01

 

Location

Share With Friends



Join the ranks of your fellow gas professionals with your membership to the Gas Processing Association of Canada.