Harmattan Gas Plant Tour – SOLD OUT!

Registrations have closed.
Harmattan Gas Plant Tour – SOLD OUT!

Harmattan Gas Plant Tour – SOLD OUT!

by
389 389 people viewed this event.

Please contact info@gpacanada.com to be added to the waitlist for this event.

We are excited to invite you to an exclusive opportunity to tour the Harmattan Gas Processing Complex, owned and operated by AltaGas.

The Harmattan complex has natural gas processing capacity of 490 Mmcf/d consisting of sour gas treating, co-stream processing, NGL extraction, and 35,000 Bbls/d of NGL fractionation and terminalling. Harmattan also has a 450 Bbls/d capacity frac oil processing facility, a 200 tonnes/d capacity industrial grade carbon dioxide (CO2) facility and a 10,000 Bbls/d capacity NGL truck offload facility. Harmattan extracts NGLs from the raw natural gas delivered for processing, fractionates the recovered NGLs into specification ethane, propane, butane and condensate, and provides storage and terminalling services for each product. (www.altagas.ca)

Event Details:Wednesday, September 25, 2024

  • 08:30 Meet at SAIT – outside Clayton Carroll Building, just west of the MacPhail School of Energy
  • 09:00 Bus departure
  • 10:30 Arrive at Harmattan Gas Plant
  • 10:30 – 11:00 Safety orientation
  • 11:00 – 13:00 Plant tour
  • 13:00 – 15:00 Lunch
  • 15:00 – 17:00 Return to SAIT

Cost (+gst):

$50/GPAC member
$75/non-member
$20/student

Included:

  • Transportation to and from the SAIT campus
  • Lunch sponsored by Spartan Controls

Other Considerations:

No lose clothing; long pants; sturdy closed toed shoes required

Don’t miss this chance to explore a key facility in Alberta’s energy sector, connect with industry professionals, and gain valuable insights into the gas processing industry.

Space is limited

Registrations have closed.

Harmattan Gas Plant Tour – SOLD OUT!

Harmattan Gas Plant Tour – SOLD OUT!

by

388 388 people viewed this event.

Please contact info@gpacanada.com to be added to the waitlist for this event.

We are excited to invite you to an exclusive opportunity to tour the Harmattan Gas Processing Complex, owned and operated by AltaGas.

The Harmattan complex has natural gas processing capacity of 490 Mmcf/d consisting of sour gas treating, co-stream processing, NGL extraction, and 35,000 Bbls/d of NGL fractionation and terminalling. Harmattan also has a 450 Bbls/d capacity frac oil processing facility, a 200 tonnes/d capacity industrial grade carbon dioxide (CO2) facility and a 10,000 Bbls/d capacity NGL truck offload facility. Harmattan extracts NGLs from the raw natural gas delivered for processing, fractionates the recovered NGLs into specification ethane, propane, butane and condensate, and provides storage and terminalling services for each product. (www.altagas.ca)

Event Details:Wednesday, September 25, 2024

  • 08:30 Meet at SAIT – outside Clayton Carroll Building, just west of the MacPhail School of Energy
  • 09:00 Bus departure
  • 10:30 Arrive at Harmattan Gas Plant
  • 10:30 – 11:00 Safety orientation
  • 11:00 – 13:00 Plant tour
  • 13:00 – 15:00 Lunch
  • 15:00 – 17:00 Return to SAIT

Cost (+gst):

$50/GPAC member
$75/non-member
$20/student

Included:

  • Transportation to and from the SAIT campus
  • Lunch sponsored by Spartan Controls

Other Considerations:

No lose clothing; long pants; sturdy closed toed shoes required

Don’t miss this chance to explore a key facility in Alberta’s energy sector, connect with industry professionals, and gain valuable insights into the gas processing industry.

Space is limited



Join the ranks of your fellow gas professionals with your membership to the Gas Processing Association of Canada.